How much will a use permit application cost?
The fee for processing a use permit will be $100; however, the licensed inspector will be charging a separate fee for the inspection and report that will accompany the application and the inspection will require pumping of the septic tank(s), in most cases.

Show All Answers

1. What is an onsite wastewater treatment system (OWTS)?
2. What is a use permit?
3. When is an OWTS use permit required?
4. Why was this regulation passed?
5. Are there any times where the use permit requirement would be waived?
6. How do I obtain a use permit?
7. What will an inspection report done by a licensed system inspector entail?
8. How long is an inspection good for?
9. Who will conduct the inspections?
10. Will the process of obtaining a use permit delay closing or prolong the time necessary to get a building permit?
11. How much will a use permit application cost?